S.N. | Name Of Project | Name Of Client | Completion Year |
---|---|---|---|
1 | Geotechnical Investigation Work For Seven (7) Elevated Metro Stations / Elevated Viaduct Between Ch. 14+499 To 25+415, Viaduct Connecting Depot Leading Upto Interface Location, Nine (9) Elevated Metro Stations. | M/s Stup Consultants Pvt Ltd. | 2022 |
2 | Geotechnical Investigation Work For Development Of Greenfield Airport At Udhamsing Nagar District In Uttrakhand State, India | M/s Creative Group, S-21, Hargovind Enclave, Main Chattarpur Road, Chhatarpur, New Delhi-110074 | 2022 |
3 | Prebid Geotechnical Investigation Work For Warehousing Silo Agri Logistics Facility At Harduaganj , UP. | M/s Adani Logistics Limited | 2022 |
4 | Prebid Geotechnical Investigation Work For Warehousing Silo Agri Logistics Facility For Khurja , UP. | M/s Adani Logistics Limited | 2022 |
5 | Prebid Geotechnical Investigation Work For Warehousing Silo Agri Logistics Facility For Chandari , Uttar Pradesh | M/s Adani Logistics Limited | 2022 |
6 | Prebid Geotechnical Investigation Work For Warehousing Silo Agri Logistics Facility For Roza , Uttar Pradesh | M/s Adani Logistics Limited | 2022 |
7 | Geotechnical Investigation Work For Proposed ITPO Project At Pragati Maidan | M/s Shapoorji Pallonji & Co Pvt Ltd | 2022 |
8 | Geotechnical Investigation Work For ERC Project At Gail Dibiyapur | M/s Tata Consulting Engineers Ltd | 2022 |
9 | Geotechnical Investigation Work For ERC Project At IOCL Jaipur | M/s Tata Consulting Engineers Ltd | 2022 |
10 | Geotechnical Investigation Work For Proposed Ghaghara Bridge Extension At Varanasi -Gorakhpur Road Project | M/s Kgts Engineers (India) Pvt Ltd | 2022 |
11 | Soil Investigation Work For Proposed Residential Building (G+13) At Sector – 12, R.K Puram, Delhi. | M/s NBCC India Limited. Community Centre Building, Opp. Netaji Nagar Market, Q South, Delhi. | 2021 |
12 | Soil Investigation Work At UP Water Project In The District Of Mainpuri Covering Villages With Household Connections. | M/s NCC Limited. Awash Vikash Colony, Sector – 5, Near Uttam Hospital, Mainpuri – 205001 | 2021 |
13 | Soil Investigation Work For Preparation Of Detailed Master Plan & Preliminary Design Report For Roads & Service/utilities For Integrated Manufacturing Cluster (IMC) At Hisar. | M/s Tata Consulting Engineers Ltd., Green Boulevard, Ground Floor, Tower B & C, Plot No. – B9A, Sector – 62, Noida – 201301 (U.P) | 2021 |
14 | Consultancy Services For Soil Investigation Survey For Tata Consultancy Services Limited For Noida Campus SEZ Developer. | M/s TATA Consultancy Services Limited, Sector 157, Noida, Distt. Gautam Budh Nagar, Uttar Pradesh 201310. | 2021 |
15 | Geo-Technical And Material Investigations For Preparation Of Detailed Project Report For Development Of Economic Corridor, Inter Corridor And Feeder Routes To Improve The Efficiency Of Freight Movement In India (LOT-2/ Punjab/ Package-3) In The State Of Punjab. | M/s RITES Ltd., Highway Division, RITES Bhawan,(4th Floor, Right Wing), Plot-1,Sector 29 Gurgaon-122 001 | 2020 |
16 | Geotechnical Investigation For Package-1 (CH-0.3000 To 28.700 Km)-Construction Of 6-lane Access-controlled Greenfield Highway From Km -0.300 To Km 28.700 Of Sangariya-Rasisar Section & Package-2 Of NH-754K As A Part Of Amritsar-Jamnagar Economic Corridor (EC) In Haryana And Rajasthan On EPC Under Bharatmala Pariyojana. | M/s Krishna Constriction., 95, Golden Avenue - III, Roorkee Road, Meerut - 250001 (U.P) Meerut (UP). | 2020 |
17 | Soil Investigation Work For 350 MW Solar Plant At Village Noorsar, Distt. - Bikaner, Rajasthan. | M/s AVAADA POWER PRIVATE IMITED C-11, Sector-65, Noida,UP - 201301 INDIA T: +91 120 6757062 | 2020 |
18 | Geotechnical Investigation For " Construction Of 6-lane Access Controlled Greenfield Highway From Km 99+000 To Km 130+073 Of Rajasthan/Gujarat Border To Santalpur Section Of NH-754K As Apart Of Amritsar-Jamnagar Economic Corridor In The State Of Gujarat On EPC Mode Under Bharatmala Pariyojana (Phase-I) (AJ/RGBS/Package-4) | M/s Accrete Consulting Engineers (P) Ltd. NM-8, 2nd Floor, Sona Tower, Old DLF Commercial Complex, Sector - 14, Gurgaon - 122001, (Haryana), India. | 2020 |
19 | Soil Investigation, Topographical & GPRS Survey Work & Cross Hole Shear Test At Cairns India Limited, Barmer, (Rajasthan). | M/s Ion Exchange India Limited, Flat-B-8, Second Floor, Local Shopping Complex, Naraina Vihar, New Delhi-110028 | 2019 |
20 | Soil Investigation Work For "Construction Of 8-Lane Expressway Starting Befor KMP Ecpressway Ch.0+000 And Ends At Ch.183+000 On EPC Mode Under Bharatmala Pariyojana In The The State Of Haryana/Rajasthan," (PKG-1,2,3,4,5,6). | M/s Larsen & Toubro Limited., Landmark 'B', 5th Floor, Suren Rd, Off Andheri-Kurla Rd, Chakala, Andheri (East), Mumbai - 400093 | 2019 |
21 | Soil Investigation Work For Redevelopment Of General Pool Residential Colony At Sriniwaspuri, New Delhi. | M/s Shapoorji Pallonji & Co. Pvt. Ltd. Videocon Tower, 9th Floor, JhandewalanExtn., New Delhi - 110055. | 2019 |
22 | Soil Investigation Work And Topographical Survey Work For 20 MLD Common Effluent Treatment Plant (CETP) Upto Teritary Treatment Along With Treated Sewage Diulated Facility For Jajmau Leather Cluster, U.P. (PO No. EPC-PO-30280 / 10P152 Dated 15.05.2019 & Amendment No. 1 Dated 24.05.2019) | M/s Va Tech Wabag Limited, No. 17, 200 Feet Thoraipakkam – Pallavaram Main Road, SunnambuKolathur, Chennai – 600117, Tamil Nadu, India. | 2019 |
23 | Geotechnical Investigation For Proposed Structures At Bagpat-Shamli-Saharanpur Section In The State Of Uttar Pradesh. | M/s Krishna Constriction., 95, Golden Avenue - III, Roorkee Road, Meerut - 250001 (U.P) Meerut (UP). | 2019 |
24 | Geo-technical Investigation Work For Preparation Of DPR For Metro Connectivity In Between Faridabad (Bata Chowk) To Gurugram (Sec 45). | M/s Delhi Metro Rail Corporation Ltd., 25, Ashoka Road, New Delhi - 110001. | 2019 |
25 | Geotechnical Investigation For Proposed Structures Under Package-IV (CH-88.000 To 115.000 Km)-Construction Of 6-lane Access-controlled Greenfield Highway Of Sangariya-Rasisar Section Of NH-754K As A Part Of Amritsar-Jamnagar Economic Corridor (EC) In Haryana And Rajasthan On EPC Under Bharatmala Pariyojana (Phase-I) | M/s Jakson Eminence Pvt. Ltd., A-43, Phase-II (Extension), Hosiery Complex, Noida-201305 (UP). | 2019 |
26 | Geotechnical Investigation Work For Additional 4 Lane Divided Highway Km 52.250 To Km 130.560 Meerut – Muzaffar Nagar Section Of NH-58. | M/s Krishna Constriction., 95, Golden Avenue - III, Roorkee Road, Meerut - 250001 (U.P) Meerut (UP). | 2018 |
27 | Geotechnical Investigation Work For Additional 4 Lane Divided Highway Km 52.250 To Km 130.560 Meerut – Muzaffar Nagar Section Of NH-58. | M/s Krishna Constriction., 95, Golden Avenue - III, Roorkee Road, Meerut - 250001 (U.P) Meerut (UP). | 2018 |
28 | Soil Investigation Work For Redevelopment Of GPRA At Netaji Nagar, New Delhi. | M/s Shapoorji Pallonji & Co. Pvt. Ltd. Videocon Tower, 9th Floor, JhandewalanExtn., New Delhi - 110055. | 2018 |
29 | Soil Investigation Work For “Construction Of New Domestic Terminal Building And Other Allied Structures (Phase I & II) At Patna Airport | M/s MeinHardt India, A-8, Sector – 16, Noida, Uttar Pradesh, India 201301. | 2018 |
30 | Soil Investigation Work For Rehabilitation And Up Gradation Of Jabalpur-Hiran River Section Of NH-12 From Km.66+000 To 130+000 (Design Length-64 Km.) To Four Lane With Paved Shoulder As Cement Concrete Pavement Road In The State Of Madhya Pradesh On EPC Mode. | M/s Krishna Constriction., 95, Golden Avenue - III, Roorkee Road, Meerut - 250001 (U.P) Meerut (UP). | 2018 |
31 | Geotechnical Investigation Work For Multilevel Car Parking Facility And Commercial Complex On PPP Model At District Centre, Janakpuri. | M/s Delhi Integrated Multi-Model Transit System Limited, 1st Floor, Maharana Pratap ISBT Building, Kashmere Gate, Delhi - 110 006, India | 2018 |
32 | Soil Investigation Work For 1. Multilevel Car Parking Facility And Commercial Complex On PPP Model At Janakpuri C-Block Community Centre (Janak Cinema Complex). | M/s Delhi Integrated Multi-Model Transit System Limited, 1st Floor, Maharana Pratap ISBT Building, Kashmere Gate, Delhi - 110 006, India | 2018 |
33 | Soil Investigation & Topographical Survey Work For Proposed 20MW Bio CNG Based Power Plant At Village Bhutal Kalan, Tehsil Lehraghagga, District Sangrur In State Of Punjab. | M/s VERBIO INDIA PVT. LIMITED., SCO 156-157, First Floor, Sector – 9C, Madhya Marg, Chandigarh - 160009 | 2018 |
34 | Soil Investigation Work For Construction Of Elevated Corridor Partially Access Controlled Highway From Samrala Chowk At Km 76+000 To Km 85+980 Of NH-95 In The State Of Punjab. | M/s Gammon Engineers & Contractors Pvt. Ltd. 9505- Elevated Highway Road Project, Ludhiana, Punjab – 141003. | 2018 |
35 | Topographical Survey Work For Rehabilitation And Up-gradation Of Rithala Phase – 1 (182 MLD) Wastewater Treatment Plant (WWTP) At Rithala, New Delhi. | M/s Va Tech Wabag Limited, No. 17, 200 Feet Thoraipakkam – Pallavaram Main Road, SunnambuKolathur, Chennai – 600117, Tamil Nadu, India. | 2018 |
36 | Soil Investigation Work For 9301-Western Dedicated Freight Corridor-Special Steel Bridge Contract Pavkage 3A (R) (ICB No. CT P-3) In The State Of Gujrat. | M/s Gammon Engineers And Contactors Pvt. Ltd, 9301-Mahi- Sabarmati Project, Saidarshan Residency, Near National Highway No. – 8, VasadChokdy, Behind New Bus Stand, P.O Vasad, DisttAnand, Gujrat - 388306 | 2017 |
37 | Drilling Soil/ Rock For Soil Investigation At Delhi Earth Station (DES), New Delhi. | Office Of The Group Head Construction And Maintenance Group, Space Application Centre (SAC), Jodhpur Tekra, Ambawadi Vistar, P.O., Ahmedabad - 380015 | 2017 |
38 | Soil Investigation Work For Construction Of IOCL Bottling Plant At Trishundi (U.P). | M/S ESSAR PROJECTS (INDIA) LTD., 27th Km SuratHazira Road, Hazira - 394270,Surat, Gujrat. | 2017 |
39 | Soil Investigation Work For Construction Of IOCL Bottling Plant At Sittarganj, Uttrakhand. | M/S ESSAR PROJECTS (INDIA) LTD., 27th Km SuratHazira Road, Hazira - 394270, Surat, Gujrat. | 2017 |
40 | Geo-technical Investigation Work For Preparation Of Techno-Economic Feasibility Report For Construction Of An Underpass Below The Runway Of Chandigarh International Airport (On Mohali Side). | M/s Delhi Metro Rail Corporation Ltd., 25, Ashoka Road, New Delhi - 110001. | 2017 |
41 | Geotechnical Investigation Work For “Delhi Meerut Expressway Package –II” (Delhi-UP Border To Dasna Of NH-24). | M/s B&S Engineering Consultants Pvt. Ltd., 315-316, Vishal Chambers, P-1, Sector-18, NOIDA – 201301. | 2017 |
42 | Consulting Engineering Services For Preparation Of DPR For Water Supply System For Municipal Council Of Madhupur, Jharkhand. | M/s Tata Consulting Engineers Ltd., Green Boulevard, Ground Floor, Tower B & C, Plot No. – B 9A, Sector – 62, Noida – 201301 (U.P). Tel: 0120-6196100 | 2017 |
43 | Geotechnical Investigation Work For “Construction Of New Domestic Terminal Building And Other Allied Structures (Phase I & II) At Patna Airport” Project. | M/s MeinHardt India Pvt. Ltd. A-8, Sector - 16 Noida, Uttar Pradesh India 201301 | 2017 |
44 | Bored Cast-in-situ Piling Work At Ambience Island, NH-8, Gurgaon, Haryana. | M/s AMBIENCE PRIVATE LIMITED, L-4, Green Park Extn.-1, New Delhi - 110016. | 2017 |
45 | Soil Investigation Work For NTPC DADRI Solar Hybrid Project In Uttar Pradesh. | M/s Frenell India Private Limited., FIRST FLOOR, C-49, GULMOHAR PARK, GULMOHAR PARK, South Delhi, Delhi, 110049 | 2017 |
46 | Soil Investigations Work For Proposed Oval & Gradient Tracks At ICAT Site - II, IMT Manesar, (Haryana). | M/s International Centre For Automotive Technolgy., Plot No. 26, Sector - 3, HSIIDC, IMT, Manesar, Gurgaon - 122050 (Haryana). | 2017 |
47 | Topographical Survey And Soil Investigation Services For VizagForgenWheelPlant, LalGanj, Rae Bareli, Utter Pradesh, India | M/s SMS India Pvt.Ltd., 286, UdyogVihar, Phase-II Gurgaon – 122016 (Haryana) | 2016 |
48 | Geotechnical Investigation Work For Proposed Depot Yard At Saharanpur, (U.P). | M/s Madhepura Electric Locomotive Private Limited., 601-B, 6thFloor,Tower – 1, Konnectus, BhavbhutiMarg, Near Minto Bridge, New Delhi – 110001, India | 2016 |
49 | Geotechnical Investigation Work For Proposed Electric Locomotive Factory At Madhepura, Bihar. | M/s Madhepura Electric Locomotive Private Limited., 601-B, 6th Floor, Tower – 1, Konnectus, BhavbhutiMarg, Near Minto Bridge, New Delhi – 110001, India | 2016 |
50 | Soil Investigation & Topographical Survey Work For Land Side At Amritsar Airport, Punjab. | M/s PricewaterhouseCooper Private Limited., 17th Floor, Building 10, Tower C, DLF Cyber City, Gurgaon – 122002, Haryana, (India). | 2016 |
51 | Land Survey And Soil Investigation For Proposed Solar Plant Of 50 MW At Orai, Jalaun UP. | M/s EsselInfraprojects Ltd, 5th Floor, Ajit Singh House, Yusuf Sarai Community Centre Near Green Park Gate No.2 New Delhi-110049 | 2016 |
52 | Soil Investigation & Topographical & Contour Survey Work For Proposed Building For Dr. LalsPathLabat Lucknow (UP). | M/s Lal Pathlabs Limited, Gurgaon (Haryana). | 2016 |
53 | Geo-technical Investigation Work For Preparation Of Detailed Project Report Of Metro Extension From Narela To Kundli (Length 4.86 Km). | M/s Delhi Metro Rail Corporation Ltd., 25, Ashoka Road, New Delhi - 110001. Telefax No. 011-23362791 | 2016 |
54 | Soil Investigation Work Of Major Bridges In Connection With The Construction Of New BG Rail Line Of (RAIL VIKASH NIGAM LIMITED) | M/s Arvind Techno Engineers Pvt. Ltd. A-22, 3rd Floor, Green Park (Main), Aurobindo Marg, New Delhi - 110016. | 2015 |
55 | Geo-technical Investigation Work For Lucknow Metro Rail Project Phase-1A (13.0 Km Approximately). | M/s Delhi Metro Rail Corporation Ltd, 25 Ashoka Road, New Delhi – 110 001 | 2015 |
56 | Soil Investigation Work For Proposed Integrated Industrial Township Project Area Under Gautam Buddha Nagar District, (U.P). | M/s TATA Consulting Engineers Ltd., Green Boulevard, Ground Floor, Tower B&C, Plot No. – B9A, Sector – 62, Noida – 201301 (U.P) | 2015 |
57 | Geotechnical Investigation & Topographical Survey Work For 140 MLD STP At Dinapur, Varanasi (U.P). | M/S VA TECH WABAG LIMITED 11, Murray's Gate Road, Alwarpet, Chennai – 600 018 | 2015 |
58 | Rehabilitation, Construction, Operation, Maintenance & Management Of Bhagalpur Water Supply Project – I (BWSP1) | M/s Pan India Infraprojects Pvt. Ltd.-Bihar (A Company Of Essel Group), 1 Floor Vikas Tower Opp. Durga Mandir, Malighat. Bihar, India 842001 | 2015 |
59 | Geotechnical Investigation Work For Redevelopment Of Khan Market, New Delhi. | M/s New Delhi Municipal Council., Palika Kendra, New Delhi, India. | 2015 |
60 | Soil Investigation Work For Development Of Residential Properties For RBI At Hauz Khas, New Delhi. | M/S SHAPOORJI PALLONJI & CO PVT. LTD., 9th Floor, Videocon Tower, Block E-1, Jhandewalan Extension, New Delhi – 110055 | 2015 |
61 | Pre – Bid Geotechnical Investigation For Eastern Dedicated Freight Corridor. | M/s Punj Lloyd Limited., 78 Institutional Area, Sector – 32, Gurgaon – 122001, Haryana, India | 2015 |
62 | Sub-Soil Exploration Work For Sone Bridge Site At Dehri-on-Sone In Bihar. | M/s ATEPL-MGCPL JOINT VENTURE, A-22, 3rd Floor, Green Park (Main), Aurobindo Marg, New Delhi - 110016. | 2014 |
63 | Bored Cast-in-situ Piling Work For At Sub-station Building Near Ambience Mall, Gurgaon (Haryana). | M/s AMBIENCE PRIVATE LIMITED, L-4, Green Park Extn.-1, New Delhi - 110016. | 2014 |
64 | Plate Load Test For DMRC CC-28 Project. | M/s L&T Construction Infrastructure IC, (ECC Division), DMRC CC-28 Project, Shivaji Marg, Zakhira, New Delhi - 110015 | 2014 |
65 | Soil Investigation Work For Township Phase - I At Lalitpur (3X660 MW) In Reference To Limited Enquiry Dated 06.03.2014 For Lalitpur Super Thermal Power Project - 3X660 MW Being Setup Near Villages Mirchwara And Buraugaon, District Lalitpur In The State Of U.P. India. | M/s Anand Projects Limited. SF 01 & 35, IInd Floor, Ansals Fortune Arcade, Sec - 18, Noida. Dist.-GB.Nagar (U.P). | 2014 |
66 | Soil Investigation Work For Iconic Temple “Vrindavan Chandrodaya Mandir” At Vrindavan. | Vrindavan Chandrodaya Mandir Trust Gopal Garh, Chhatikara Road,Vrindavan - 281 121. | 2014 |
67 | Soil Investigation Work Along NH-24 From Km 0.000 To Km 49.923 (Hapur Bypass). | M/s Sadbhav Engineering Limited. Godrej Coliseum, 602, "C" Wing,Behind Everard Nagar, Sion (East), Mumbai - 400 022, India | 2014 |
68 | Soil Investigation Work For Package 1 (Motihari, Sitamarhi And Saharsa) Towns In Bihar. | M/s TATA Consulting Engineers Ltd, Green Boulevard, Ground Floor, Tower B&C, Plot No. – B9A, Sector – 62, Noida – 201301 (U.P) | 2014 |
69 | Geotechnical Investigation For Western Dedicated Freight Corridor Aligment in Mewat Disst. Of Haryanain in Connection with X-ing Of Jamnagar Loni GAIL LPG Pipe Line Between GAIL-FV-62 (MEWAT) AND FV-63 (GURGAON). | M/s DEDICATED FREIGHT CORRIDOR CORPORATION OF INDIA LIMITED. D-89, Ist Floor, Sector 2, Noida:- 201301 | 2014 |
70 | Geotechnical Investigation At Proposed 2.5 Mtr Telescope Facility Site And Topographical Survey Of PRL IFO Gurushikar Campus, Mt Abu, Rajasthan. | Physical Research Laboratory, (A Unit Of Dept. Of Space, Govt. Of India). Navrangpura, Ahmedabad – 380009, India. | 2014 |
71 | Geotechnical Investigation Work For DPR Of Proposed Mukundpur - Janakpuri West Coridor. | M/s Delhi Metro Rail Corporation Ltd, 25 Ashoka Road, New Delhi – 110 001 | 2013 |
72 | Geotechnical Investigation Work For Preparation Of DPR For Delhi Metro Phase - IV Coridors. | M/s Delhi Metro Rail Corporation Ltd, 25 Ashoka Road, New Delhi – 110 001 | 2013 |
73 | Soil Investigation Work For Elevated Road, FOB, RCC Drain, Footpath, Cycle Track, Widening / Strengthening Of Road, Rain Water Harvesting Scheme, Electrical Works And Other Allied Works And Jaypee Piling Project Sector - 134, Noida. | M/s Simplex Infrastructures Limited., "Vaikunth" (2nd Floor), 82-83, Nehru Place, New Delhi - 110019 | 2013 |
74 | Soil Investigation Work For Station Buildings Of DMRC Metro Phase-III (CC-18) Project. | M/s FEMC - Pratibha JV, DMRC CC-18 INA New Delhi | 2013 |
75 | Geotechnical Investigation Work For Modified Alignment In The State Of Haryana For Delhi-Alwar RRTS Corridor. | M/s Urban Mass Transit Company Limited. 5th Floor, “A” Wing, IFCI Tower, Nehru Place, New Delhi-110019 | 2013 |
76 | Soil Investigation Work For Station Buildings (INA, Sarojini Nagar And South Ex.) Of DMRC Metro Phase-III (CC-18) Project. | M/s FEMC - Pratibha JV, DMRC CC-18 INA New Delhi | 2013 |