S.N. Name Of Project Name Of Client Completion Year
1 Geotechnical Investigation Work & Topographical Survey Work For GATEWAY Resort At Sawai Madhopur, Rajasthan M/s Perform Projects Management Pvt. Ltd. 2025
2 Geotechnical Investigation Work For Proposed Tarang Atlantis Multistorey Group Housing Project At Faridabad M/s Ambarvan Homes LLP 2025
3 Geotechnical Investigation For Proposed Project At IIT Roorkee, Roorkee, Uttrakhand M/s Arch Manish Jain 2025
4 Geotechnical Investigation For Construction Of A New Green Field Project At HAMDARD FOODS INDIA, Plot No 1, Street No 5, Sector 5 METL, Jhajjar, Haryana. M/s Hamdard Foods India. 2025
5 GEOTECHNICAL INVESTIGATION WORK FOR PROPOSED PROJECT AT GDL ICD, PIYALA, FARIDABAD M/s Gateway Distriparks Limited 2025
6 - Soil Investigation Work For 6 Nos. Minor Bridges For The Balance Work Of 13 Km Length On Helwak - Patan - Karad Section (Km 85+000 To 88+500, Km 90+000 To 97+000, Km 99+700 To 102+200) Of NH -166 E In The State Of Maharashtra On EPC Mode M/s All Grace Developers Pvt. Ltd 2025
7 Construction Work Of 4-laning Of Budhni To Shahganj Bypass To Bari (Package-III ) Of NH-146B From Design Km 73.750 To Design Km 142.357 (Design Length 28.250 + 40.357 = 68.607 Km) Under NH (O) In The State Of Madhya Pradesh On Hybrid Annuity Mode M/s Mundan Construction Company 2025
8 Construction Work Of 4-laning Of Budhni To Shahganj Bypass To Bari (Package IV) Of NH-146B From Design Km 73.750 To Design Km 142.357 (Design Length 28.250 + 40.357 = 68.607 Km) Under NH (O In The State Of Madhya Pradesh On Hybrid Annuity Mode M/s Mundan Construction Company 2025
9 - Soil Investigation Work For Construction Of 2 Lane Elevated Flyover From City Railway Station To Collector Residence Including Entry And Exit Ramps With One Extra Exit At Court Circle Towards Chetak Circle Of Carriageway Width 5.5 Mtr. (on EPC Mode) In Udaipur M/s Transrail Lighting Limited 2025
10 Work Order For Soil Investigation Work For Construction Of Proposed ROB At Km. 406, Siddhart Nagar , Uttar Pradesh M/s Kanti Prashad Mittal 2025
11 Geotechnical Investigation For Proposed Project At Sector – 89A, Gurugram, (Haryana) M/s Arttech Residency LLP 2025
12 Soil Investigation For 250 Bedded Multispecialty Hospital For Hamdard National Foundation At Hamdard Nagar, New Delhi. M/s C P Kukreja Architects. 2024
13 Soil Investigation Work For Improvement And Up-gradation Of Newly Declared National Highways NH-227B (84 Kosi Parikrama Marg) Package –III Design Km 47+800 (Gosaiganj To Km 73+300 (Bikapur), In The State Of Uttar Pradesh On Engineering, Procurement & Construction (EPC) Basis.in The State Of Uttar Pradesh M/s All Grace Developers Pvt. Ltd 2024
14 Geotechnical Investigation Work For Proposed Varanasi Airport , Varanasi(U.P.) Creative Group LLP 2024
15 Geotechnical Investigation Work For IIM Indore, Indore , Madhya Pradesh Sam India Built Well Pvt Ltd 2024
16 Soil Investigation Work For Construction Of Kasrawad Bypass, Selani Bypass, Khargone Bypass & Bistan Bypass State Of Madhya Pradesh On EPC Mode M/s A K Shivhare Infrastructure Pvt Ltd 2024
17 Soil Investigation Work For Nagpur Metro For Nagpur Metro Rail Project Phase 2 Automotive Square To Lekha Nagar (2A) Package-1 In The State Of Maharashtra M/s DP Jain & Co Infrastructure Pvt Ltd 2024
18 Soil Investigation Work For Construction Of Four Laning Of Rajauli-Bakhtiyarpur Section From Km 47+723 To Km 54+405 (Package-I) Of NH-31 (New NH-20) On EPC Mode In The State Of Bihar M/s KCC Infra Pvt Ltd 2024
19 Construction Of Four Lane Elevated Corridor/Flyover From Maharani Laxmibai Pratima To A.B. Road (N.H. 46) Near Girwai Police Chowki On Swarn Rekha River In Gwalior City (M.P.) (2nd Phase) M/s PNC Infra Limited 2024
20 Geotechnical Investigation & Topographical Survey And Associated Allied Works For Tau Devi Lal Sports Complex And Office Complex M/s Tata Consulting Engineers Ltd 2024
21 Geotechnical Investigation (Pre-Bid) For Construction Of 4 Lane Mirzapur Bypass Including Bridge Over River Ganga From Km 0.000 To Km 15.000 Of NH15A In The State Of Uttar Pradesh M/Ss Arvind Technocrats & Engineers LLP 2024
22 Conducting Soil Investigation For The Construction Of Boy's Hostel At Hindu College. North Campus, University Of Delhi, New Delhi M/s NBCC India Ltd 2024
23 Geotechnical Investigation Work Proposed Grain Storage Silo Complex At Kota Rajasathan M/s Kota Agri Market Private Limited 2024
24 Geotechnical Investigation Work For Extension Of Lotte India Factory At Plot No. – 4, 5, 6 & 7, Sector – 30A, IMT Rohtak, Haryana. M/s HTI Engineering Limited 2024
25 Geotechnical Investigation Work For Proposed Industrial Project At Village Phandi Boriwala, Tehsil Majra, Distt.- Sirmaur (HP). M/s ADS Spirits Pvt. Ltd. 2024
26 Geotechnical Investigation Work For Construction Of Proposed Multistoried Towers At Sector 107, Noida UP M/s Great Value Projects India Ltd., 2024
27 Geotechnical Investigation Work For Proposed 04 Nos. Rail Bridges Between Udaipura To Tikamgarh End Rail Line Work At Lalitpur Site (U.P.). M/s Lalitpur Power Generation Co. Ltd., 2023
28 Construction Of Four Lane Elevated Corridor And At-grade Improvements From Design Ch:0+000 To Design Ch: 19+870 Of Danapur – Bihta Section With Providing Connectivity To The Existing RoB Near Danapur Station (0.231 Km), 1.35 Km Ramps & At-grade Improvements To Four Lane Section On Danapur Side And Upgradation Of Existing Two Lane Carriageway To Four Lane Carriageway From Design Ch:19+870 To Design Ch:23+500 Of Bihta - Koilwar Section (Total Length 25.081 Kms) In The State Of Bihar On EPC Mode M/s Ashoka Buildcon Ltd 2023
29 Geotechnical Investigation Work For Tata Consultancy Services Limited Noida Campus - SEZ At Sector 157, Noida, Uttar Pradesh. (Phase-1 & Phase-2) M/s Tata Projects Ltd 2023
30 Geotechnical Investigation Work For Seven (7) Elevated Metro Stations / Elevated Viaduct Between Ch. 14+499 To 25+415, Viaduct Connecting Depot Leading Upto Interface Location, Nine (9) Elevated Metro Stations. M/s Stup Consultants Pvt Ltd. 2022
31 Geotechnical Investigation Work For Development Of Greenfield Airport At Udhamsing Nagar District In Uttrakhand State, India M/s Creative Group, S-21, Hargovind Enclave, Main Chattarpur Road, Chhatarpur, New Delhi-110074 2022
32 Prebid Geotechnical Investigation Work For Warehousing Silo Agri Logistics Facility At Harduaganj , UP. M/s Adani Logistics Limited 2022
33 Prebid Geotechnical Investigation Work For Warehousing Silo Agri Logistics Facility For Khurja , UP. M/s Adani Logistics Limited 2022
34 Prebid Geotechnical Investigation Work For Warehousing Silo Agri Logistics Facility For Chandari , Uttar Pradesh M/s Adani Logistics Limited 2022
35 Prebid Geotechnical Investigation Work For Warehousing Silo Agri Logistics Facility For Roza , Uttar Pradesh M/s Adani Logistics Limited 2022
36 Geotechnical Investigation Work For Construction Of Delhi-Saharanpur-Dehradun Economic Corridor Under Bharatmala Pariyojana From Design Chainage 27.000 (Vill-Lohadda) To Design Chainage 56.500 (Vill-Karaunda Mahajan) In UP On EPC Mode Package -2 M/s Krishna Constellation Pvt Ltd 2022
37 Geotechnical Investigation Work For Construction Of Delhi-Saharanpur Dehradun Economic Corridor Under BMP From Design Chainage 82.000 Vill-Khyawari To Design Chainage 119.068 (Vill-Latifpur At Saharanpur Bypass) In UP On EPC Mode Package-4 M/s Krishna Constellation Pvt Ltd 2022
38 Geotechnical Investigation Work For City Side Development At Lucknow Airport M/s Adani Airport Holdings Limited 2022
39 Geotechnical Investigation Work For Proposed ITPO Project At Pragati Maidan M/s Shapoorji Pallonji & Co Pvt Ltd 2022
40 Geotechnical Investigation Work For ERC Project At Gail Dibiyapur M/s Tata Consulting Engineers Ltd 2022
41 Geotechnical Investigation Work For ERC Project At IOCL Jaipur M/s Tata Consulting Engineers Ltd 2022
42 Geotechnical Investigation Work For Proposed Ghaghara Bridge Extension At Varanasi -Gorakhpur Road Project M/s Kgts Engineers (India) Pvt Ltd 2022
43 Geotechnical Investigation Work For Upgradation/ Construction Of Spur Of Muzaffarnagar Connecting NH-709AD (Panipat-Shamli-Muzaffarnagar Highway M/s NV Project Consultancy Pvt Ltd . 2022
44 Geotechnical Investigation Work For Last Three Stations At Agra Metro Rail Project M/s UPMRC Limited 2022
45 Soil Investigation Work For Proposed Residential Building (G+13) At Sector – 12, R.K Puram, Delhi. M/s NBCC India Limited. Community Centre Building, Opp. Netaji Nagar Market, Q South, Delhi. 2021
46 Soil Investigation Work At UP Water Project In The District Of Mainpuri Covering Villages With Household Connections. M/s NCC Limited. Awash Vikash Colony, Sector – 5, Near Uttam Hospital, Mainpuri – 205001 2021
47 Soil Investigation Work For Preparation Of Detailed Master Plan & Preliminary Design Report For Roads & Service/utilities For Integrated Manufacturing Cluster (IMC) At Hisar. M/s Tata Consulting Engineers Ltd., Green Boulevard, Ground Floor, Tower B & C, Plot No. – B9A, Sector – 62, Noida – 201301 (U.P) 2021
48 Consultancy Services For Soil Investigation Survey For Tata Consultancy Services Limited For Noida Campus SEZ Developer. M/s TATA Consultancy Services Limited, Sector 157, Noida, Distt. Gautam Budh Nagar, Uttar Pradesh 201310. 2021
49 Geo-Technical And Material Investigations For Preparation Of Detailed Project Report For Development Of Economic Corridor, Inter Corridor And Feeder Routes To Improve The Efficiency Of Freight Movement In India (LOT-2/ Punjab/ Package-3) In The State Of Punjab. M/s RITES Ltd., Highway Division, RITES Bhawan,(4th Floor, Right Wing), Plot-1,Sector 29 Gurgaon-122 001 2020
50 Geotechnical Investigation For Package-1 (CH-0.3000 To 28.700 Km)-Construction Of 6-lane Access-controlled Greenfield Highway From Km -0.300 To Km 28.700 Of Sangariya-Rasisar Section & Package-2 Of NH-754K As A Part Of Amritsar-Jamnagar Economic Corridor (EC) In Haryana And Rajasthan On EPC Under Bharatmala Pariyojana. M/s Krishna Constriction., 95, Golden Avenue - III, Roorkee Road, Meerut - 250001 (U.P) Meerut (UP). 2020
51 Soil Investigation Work For 350 MW Solar Plant At Village Noorsar, Distt. - Bikaner, Rajasthan. M/s AVAADA POWER PRIVATE IMITED C-11, Sector-65, Noida,UP - 201301 INDIA T: +91 120 6757062 2020
52 Geotechnical Investigation For " Construction Of 6-lane Access Controlled Greenfield Highway From Km 99+000 To Km 130+073 Of Rajasthan/Gujarat Border To Santalpur Section Of NH-754K As Apart Of Amritsar-Jamnagar Economic Corridor In The State Of Gujarat On EPC Mode Under Bharatmala Pariyojana (Phase-I) (AJ/RGBS/Package-4) M/s Accrete Consulting Engineers (P) Ltd. NM-8, 2nd Floor, Sona Tower, Old DLF Commercial Complex, Sector - 14, Gurgaon - 122001, (Haryana), India. 2020
53 Soil Investigation, Topographical & GPRS Survey Work & Cross Hole Shear Test At Cairns India Limited, Barmer, (Rajasthan). M/s Ion Exchange India Limited, Flat-B-8, Second Floor, Local Shopping Complex, Naraina Vihar, New Delhi-110028 2019
54 Soil Investigation Work For "Construction Of 8-Lane Expressway Starting Befor KMP Ecpressway Ch.0+000 And Ends At Ch.183+000 On EPC Mode Under Bharatmala Pariyojana In The The State Of Haryana/Rajasthan," (PKG-1,2,3,4,5,6). M/s Larsen & Toubro Limited., Landmark 'B', 5th Floor, Suren Rd, Off Andheri-Kurla Rd, Chakala, Andheri (East), Mumbai - 400093 2019
55 Soil Investigation Work For Redevelopment Of General Pool Residential Colony At Sriniwaspuri, New Delhi. M/s Shapoorji Pallonji & Co. Pvt. Ltd. Videocon Tower, 9th Floor, JhandewalanExtn., New Delhi - 110055. 2019
56 Soil Investigation Work And Topographical Survey Work For 20 MLD Common Effluent Treatment Plant (CETP) Upto Teritary Treatment Along With Treated Sewage Diulated Facility For Jajmau Leather Cluster, U.P. (PO No. EPC-PO-30280 / 10P152 Dated 15.05.2019 & Amendment No. 1 Dated 24.05.2019) M/s Va Tech Wabag Limited, No. 17, 200 Feet Thoraipakkam – Pallavaram Main Road, SunnambuKolathur, Chennai – 600117, Tamil Nadu, India. 2019
57 Geotechnical Investigation For Proposed Structures At Bagpat-Shamli-Saharanpur Section In The State Of Uttar Pradesh. M/s Krishna Constriction., 95, Golden Avenue - III, Roorkee Road, Meerut - 250001 (U.P) Meerut (UP). 2019
58 Geo-technical Investigation Work For Preparation Of DPR For Metro Connectivity In Between Faridabad (Bata Chowk) To Gurugram (Sec 45). M/s Delhi Metro Rail Corporation Ltd., 25, Ashoka Road, New Delhi - 110001. 2019
59 Geotechnical Investigation For Proposed Structures Under Package-IV (CH-88.000 To 115.000 Km)-Construction Of 6-lane Access-controlled Greenfield Highway Of Sangariya-Rasisar Section Of NH-754K As A Part Of Amritsar-Jamnagar Economic Corridor (EC) In Haryana And Rajasthan On EPC Under Bharatmala Pariyojana (Phase-I) M/s Jakson Eminence Pvt. Ltd., A-43, Phase-II (Extension), Hosiery Complex, Noida-201305 (UP). 2019
60 Geotechnical Investigation Work For Additional 4 Lane Divided Highway Km 52.250 To Km 130.560 Meerut – Muzaffar Nagar Section Of NH-58. M/s Krishna Constriction., 95, Golden Avenue - III, Roorkee Road, Meerut - 250001 (U.P) Meerut (UP). 2018
61 Geotechnical Investigation Work For Additional 4 Lane Divided Highway Km 52.250 To Km 130.560 Meerut – Muzaffar Nagar Section Of NH-58. M/s Krishna Constriction., 95, Golden Avenue - III, Roorkee Road, Meerut - 250001 (U.P) Meerut (UP). 2018
62 Soil Investigation Work For Redevelopment Of GPRA At Netaji Nagar, New Delhi. M/s Shapoorji Pallonji & Co. Pvt. Ltd. Videocon Tower, 9th Floor, JhandewalanExtn., New Delhi - 110055. 2018
63 Soil Investigation Work For “Construction Of New Domestic Terminal Building And Other Allied Structures (Phase I & II) At Patna Airport M/s MeinHardt India, A-8, Sector – 16, Noida, Uttar Pradesh, India 201301. 2018
64 Soil Investigation Work For Rehabilitation And Up Gradation Of Jabalpur-Hiran River Section Of NH-12 From Km.66+000 To 130+000 (Design Length-64 Km.) To Four Lane With Paved Shoulder As Cement Concrete Pavement Road In The State Of Madhya Pradesh On EPC Mode. M/s Krishna Constriction., 95, Golden Avenue - III, Roorkee Road, Meerut - 250001 (U.P) Meerut (UP). 2018
65 Geotechnical Investigation Work For Multilevel Car Parking Facility And Commercial Complex On PPP Model At District Centre, Janakpuri. M/s Delhi Integrated Multi-Model Transit System Limited, 1st Floor, Maharana Pratap ISBT Building, Kashmere Gate, Delhi - 110 006, India 2018
66 Soil Investigation Work For 1. Multilevel Car Parking Facility And Commercial Complex On PPP Model At Janakpuri C-Block Community Centre (Janak Cinema Complex). M/s Delhi Integrated Multi-Model Transit System Limited, 1st Floor, Maharana Pratap ISBT Building, Kashmere Gate, Delhi - 110 006, India 2018
67 Soil Investigation & Topographical Survey Work For Proposed 20MW Bio CNG Based Power Plant At Village Bhutal Kalan, Tehsil Lehraghagga, District Sangrur In State Of Punjab. M/s VERBIO INDIA PVT. LIMITED., SCO 156-157, First Floor, Sector – 9C, Madhya Marg, Chandigarh - 160009 2018
68 Soil Investigation Work For Construction Of Elevated Corridor Partially Access Controlled Highway From Samrala Chowk At Km 76+000 To Km 85+980 Of NH-95 In The State Of Punjab. M/s Gammon Engineers & Contractors Pvt. Ltd. 9505- Elevated Highway Road Project, Ludhiana, Punjab – 141003. 2018
69 Topographical Survey Work For Rehabilitation And Up-gradation Of Rithala Phase – 1 (182 MLD) Wastewater Treatment Plant (WWTP) At Rithala, New Delhi. M/s Va Tech Wabag Limited, No. 17, 200 Feet Thoraipakkam – Pallavaram Main Road, SunnambuKolathur, Chennai – 600117, Tamil Nadu, India. 2018
70 Soil Investigation Work For 9301-Western Dedicated Freight Corridor-Special Steel Bridge Contract Pavkage 3A (R) (ICB No. CT P-3) In The State Of Gujrat. M/s Gammon Engineers And Contactors Pvt. Ltd, 9301-Mahi- Sabarmati Project, Saidarshan Residency, Near National Highway No. – 8, VasadChokdy, Behind New Bus Stand, P.O Vasad, DisttAnand, Gujrat - 388306 2017
71 Drilling Soil/ Rock For Soil Investigation At Delhi Earth Station (DES), New Delhi. Office Of The Group Head Construction And Maintenance Group, Space Application Centre (SAC), Jodhpur Tekra, Ambawadi Vistar, P.O., Ahmedabad - 380015 2017
72 Soil Investigation Work For Construction Of IOCL Bottling Plant At Trishundi (U.P). M/S ESSAR PROJECTS (INDIA) LTD., 27th Km SuratHazira Road, Hazira - 394270,Surat, Gujrat. 2017
73 Soil Investigation Work For Construction Of IOCL Bottling Plant At Sittarganj, Uttrakhand. M/S ESSAR PROJECTS (INDIA) LTD., 27th Km SuratHazira Road, Hazira - 394270, Surat, Gujrat. 2017
74 Geo-technical Investigation Work For Preparation Of Techno-Economic Feasibility Report For Construction Of An Underpass Below The Runway Of Chandigarh International Airport (On Mohali Side). M/s Delhi Metro Rail Corporation Ltd., 25, Ashoka Road, New Delhi - 110001. 2017
75 Geotechnical Investigation Work For “Delhi Meerut Expressway Package –II” (Delhi-UP Border To Dasna Of NH-24). M/s B&S Engineering Consultants Pvt. Ltd., 315-316, Vishal Chambers, P-1, Sector-18, NOIDA – 201301. 2017
76 Consulting Engineering Services For Preparation Of DPR For Water Supply System For Municipal Council Of Madhupur, Jharkhand. M/s Tata Consulting Engineers Ltd., Green Boulevard, Ground Floor, Tower B & C, Plot No. – B 9A, Sector – 62, Noida – 201301 (U.P). Tel: 0120-6196100 2017
77 Geotechnical Investigation Work For “Construction Of New Domestic Terminal Building And Other Allied Structures (Phase I & II) At Patna Airport” Project. M/s MeinHardt India Pvt. Ltd. A-8, Sector - 16 Noida, Uttar Pradesh India 201301 2017
78 Bored Cast-in-situ Piling Work At Ambience Island, NH-8, Gurgaon, Haryana. M/s AMBIENCE PRIVATE LIMITED, L-4, Green Park Extn.-1, New Delhi - 110016. 2017
79 Soil Investigation Work For NTPC DADRI Solar Hybrid Project In Uttar Pradesh. M/s Frenell India Private Limited., FIRST FLOOR, C-49, GULMOHAR PARK, GULMOHAR PARK, South Delhi, Delhi, 110049 2017
80 Soil Investigations Work For Proposed Oval & Gradient Tracks At ICAT Site - II, IMT Manesar, (Haryana). M/s International Centre For Automotive Technolgy., Plot No. 26, Sector - 3, HSIIDC, IMT, Manesar, Gurgaon - 122050 (Haryana). 2017
81 Topographical Survey And Soil Investigation Services For VizagForgenWheelPlant, LalGanj, Rae Bareli, Utter Pradesh, India M/s SMS India Pvt.Ltd., 286, UdyogVihar, Phase-II Gurgaon – 122016 (Haryana) 2016
82 Geotechnical Investigation Work For Proposed Depot Yard At Saharanpur, (U.P). M/s Madhepura Electric Locomotive Private Limited., 601-B, 6thFloor,Tower – 1, Konnectus, BhavbhutiMarg, Near Minto Bridge, New Delhi – 110001, India 2016
83 Geotechnical Investigation Work For Proposed Electric Locomotive Factory At Madhepura, Bihar. M/s Madhepura Electric Locomotive Private Limited., 601-B, 6th Floor, Tower – 1, Konnectus, BhavbhutiMarg, Near Minto Bridge, New Delhi – 110001, India 2016
84 Soil Investigation & Topographical Survey Work For Land Side At Amritsar Airport, Punjab. M/s PricewaterhouseCooper Private Limited., 17th Floor, Building 10, Tower C, DLF Cyber City, Gurgaon – 122002, Haryana, (India). 2016
85 Land Survey And Soil Investigation For Proposed Solar Plant Of 50 MW At Orai, Jalaun UP. M/s EsselInfraprojects Ltd, 5th Floor, Ajit Singh House, Yusuf Sarai Community Centre Near Green Park Gate No.2 New Delhi-110049 2016
86 Soil Investigation & Topographical & Contour Survey Work For Proposed Building For Dr. LalsPathLabat Lucknow (UP). M/s Lal Pathlabs Limited, Gurgaon (Haryana). 2016
87 Geo-technical Investigation Work For Preparation Of Detailed Project Report Of Metro Extension From Narela To Kundli (Length 4.86 Km). M/s Delhi Metro Rail Corporation Ltd., 25, Ashoka Road, New Delhi - 110001. Telefax No. 011-23362791 2016
88 Soil Investigation Work Of Major Bridges In Connection With The Construction Of New BG Rail Line Of (RAIL VIKASH NIGAM LIMITED) M/s Arvind Techno Engineers Pvt. Ltd. A-22, 3rd Floor, Green Park (Main), Aurobindo Marg, New Delhi - 110016. 2015
89 Geo-technical Investigation Work For Lucknow Metro Rail Project Phase-1A (13.0 Km Approximately). M/s Delhi Metro Rail Corporation Ltd, 25 Ashoka Road, New Delhi – 110 001 2015
90 Soil Investigation Work For Proposed Integrated Industrial Township Project Area Under Gautam Buddha Nagar District, (U.P). M/s TATA Consulting Engineers Ltd., Green Boulevard, Ground Floor, Tower B&C, Plot No. – B9A, Sector – 62, Noida – 201301 (U.P) 2015
91 Geotechnical Investigation & Topographical Survey Work For 140 MLD STP At Dinapur, Varanasi (U.P). M/S VA TECH WABAG LIMITED 11, Murray's Gate Road, Alwarpet, Chennai – 600 018 2015
92 Rehabilitation, Construction, Operation, Maintenance & Management Of Bhagalpur Water Supply Project – I (BWSP1) M/s Pan India Infraprojects Pvt. Ltd.-Bihar (A Company Of Essel Group), 1 Floor Vikas Tower Opp. Durga Mandir, Malighat. Bihar, India 842001 2015
93 Geotechnical Investigation Work For Redevelopment Of Khan Market, New Delhi. M/s New Delhi Municipal Council., Palika Kendra, New Delhi, India. 2015
94 Soil Investigation Work For Development Of Residential Properties For RBI At Hauz Khas, New Delhi. M/S SHAPOORJI PALLONJI & CO PVT. LTD., 9th Floor, Videocon Tower, Block E-1, Jhandewalan Extension, New Delhi – 110055 2015
95 Pre – Bid Geotechnical Investigation For Eastern Dedicated Freight Corridor. M/s Punj Lloyd Limited., 78 Institutional Area, Sector – 32, Gurgaon – 122001, Haryana, India 2015
96 Sub-Soil Exploration Work For Sone Bridge Site At Dehri-on-Sone In Bihar. M/s ATEPL-MGCPL JOINT VENTURE, A-22, 3rd Floor, Green Park (Main), Aurobindo Marg, New Delhi - 110016. 2014
97 Bored Cast-in-situ Piling Work For At Sub-station Building Near Ambience Mall, Gurgaon (Haryana). M/s AMBIENCE PRIVATE LIMITED, L-4, Green Park Extn.-1, New Delhi - 110016. 2014
98 Plate Load Test For DMRC CC-28 Project. M/s L&T Construction Infrastructure IC, (ECC Division), DMRC CC-28 Project, Shivaji Marg, Zakhira, New Delhi - 110015 2014
99 Soil Investigation Work For Township Phase - I At Lalitpur (3X660 MW) In Reference To Limited Enquiry Dated 06.03.2014 For Lalitpur Super Thermal Power Project - 3X660 MW Being Setup Near Villages Mirchwara And Buraugaon, District Lalitpur In The State Of U.P. India. M/s Anand Projects Limited. SF 01 & 35, IInd Floor, Ansals Fortune Arcade, Sec - 18, Noida. Dist.-GB.Nagar (U.P). 2014
100 Soil Investigation Work For Iconic Temple “Vrindavan Chandrodaya Mandir” At Vrindavan. Vrindavan Chandrodaya Mandir Trust Gopal Garh, Chhatikara Road,Vrindavan - 281 121. 2014
101 Soil Investigation Work Along NH-24 From Km 0.000 To Km 49.923 (Hapur Bypass). M/s Sadbhav Engineering Limited. Godrej Coliseum, 602, "C" Wing,Behind Everard Nagar, Sion (East), Mumbai - 400 022, India 2014
102 Soil Investigation Work For Package 1 (Motihari, Sitamarhi And Saharsa) Towns In Bihar. M/s TATA Consulting Engineers Ltd, Green Boulevard, Ground Floor, Tower B&C, Plot No. – B9A, Sector – 62, Noida – 201301 (U.P) 2014
103 Geotechnical Investigation For Western Dedicated Freight Corridor Aligment in Mewat Disst. Of Haryanain in Connection  with X-ing Of Jamnagar Loni GAIL LPG Pipe Line Between GAIL-FV-62 (MEWAT) AND FV-63 (GURGAON). M/s DEDICATED FREIGHT CORRIDOR CORPORATION OF INDIA LIMITED. D-89, Ist Floor, Sector 2, Noida:- 201301 2014
104 Geotechnical Investigation At Proposed 2.5 Mtr Telescope Facility Site And Topographical Survey Of PRL IFO Gurushikar Campus, Mt Abu, Rajasthan. Physical Research Laboratory, (A Unit Of Dept. Of Space, Govt. Of India). Navrangpura, Ahmedabad – 380009, India. 2014
105 Geotechnical Investigation Work For DPR Of Proposed Mukundpur - Janakpuri West Coridor. M/s Delhi Metro Rail Corporation Ltd, 25 Ashoka Road, New Delhi – 110 001 2013
106 Geotechnical Investigation Work For Preparation Of DPR For Delhi Metro Phase - IV Coridors. M/s Delhi Metro Rail Corporation Ltd, 25 Ashoka Road, New Delhi – 110 001 2013
107 Soil Investigation Work For Elevated Road, FOB, RCC Drain, Footpath, Cycle Track, Widening / Strengthening Of Road, Rain Water Harvesting Scheme, Electrical Works And Other Allied Works And Jaypee Piling Project Sector - 134, Noida. M/s Simplex Infrastructures Limited., "Vaikunth" (2nd Floor), 82-83, Nehru Place, New Delhi - 110019 2013
108 Soil Investigation Work For Station Buildings Of DMRC Metro Phase-III (CC-18) Project. M/s FEMC - Pratibha JV, DMRC CC-18 INA New Delhi 2013
109 Geotechnical Investigation Work For Modified Alignment In The State Of Haryana For Delhi-Alwar RRTS Corridor. M/s Urban Mass Transit Company Limited. 5th Floor, “A” Wing, IFCI Tower, Nehru Place, New Delhi-110019 2013