S.N. | Name Of Project | Name Of Client | Status |
---|---|---|---|
1 | Soil Investigation Work For Construction Of Jarud To Sirsala Section Of NH-361F From Existing Km 59.500 To Km 115.000 Of National Highway In The State Of Maharashtra On EPC Mode | M/s A K Sivhare Infrastructures | In Progress |
2 | Soil Investigation Work For Consultancy Construction Of 6 Lane Flyover From Khapari ROB To Mihan Interchange Design Chainage Km 8+760 To 11+450 (Length- 2.690 Km) And Upgradation Of Existing 4L +PS Road To 6L+PS With Service Road By Flexible Pavement Design Chainage Km 11+450 To 14+500 (Length- 3.05) [Total Project Length 5.74 Km] | M/s A K Sivhare Infrastructures | In Progress |
3 | Reach 3A Stations Of "Construction Of Elevated Metro Stations Seven Nos In Reach 3A, Namely (1) Hingna Mount View, (2) Rajiv Nagar, (3) Wanadongri, (4) APMC, (5) Raipur, (6) Hingna Bus Station, (7) Hingna Of NMRP Phase-2"of Maha-Metro, Nagpur. | M/s Madhusudan Agrawal Projects Pvt. Ltd. | In Progress |
4 | Soil Investigation Work For Transmission Line G-564 – 400 KV Twin HTLS LILO Babhleswar To Padge And 400 KV Quad Boisar Velgaon | M/s Transrail Lightning Limited | In Progress |
5 | Geotechnical Investigation For Proposed Project For ACE Plant-10 At Dhatir,Palwal, (Haryana) | M/s ACE Ltd | In Progress |
6 | Geotechnical Investigation Work For Construction Of A Four-lane Pathalgaon KunkuriCG/JH Border Section Of NH43 Starting From End Point Of NH-130A Design Ch.00.000 To Ch. 104.250 (from Turua Ama Vill To Putrichoura Vill) | M/s Krishna Constellation Pvt Ltd | In Progress |
7 | Soil Testing For Construction Of Additional Structures Improvement Of Service Road And Maintenance Of Six Lane Gurgaon-Jaipur Section Of NH48 (old NH-8) Between Km 42.700 To Km 107.100 In The States Of Haryana On EPC Mode | M/s Sarovadaya Infra | In Progress |